Exhibited documents
- Form 5A for Grosvenor LW104 TG – HPI #21 04/04/2020 (PDF, 600.0KB)
- Form 5A for Grosvenor LW104 TG – HPI#22 06/04/2020 (PDF, 509.3KB)
- Form 5A for Grosvenor LW104 TG – HPI#23 07/04/2020 (PDF, 599.5KB)
- Learning from Incidents Investigation Report for 4 Grosvenor HPIs on 21/04/2020 and 23/04/2020 (PDF, 2.8MB)
- Standard Operating Procedure LW104 Second Workings (PDF, 2.9MB)
- Table of LW103 methane exceedances (PDF, 66.5KB)
- Mine Record Entry on 02/07/2019 to inspect LW103 at Grosvenor mine (PDF, 2.1MB)
- Form 1A Notice of Confirmation for LW103 TG methane exceedance (PDF, 169.5KB)
- Mine Record Entry on 08/08/2019 to attend a safety reset meeting at Grosvenor mine (PDF, 531.9KB)
- Form 5A for Grosvenor LW103 TG – HPI #1 02/07/2019 (PDF, 503.7KB)
- Form 5A for Grosvenor LW103 TG – HPI #3 11/07/2019 (PDF, 366.6KB)
- Form 5A for Grosvenor LW103 TG – HPI #9 24/07/2019 (PDF, 494.5KB)
- Form 5A for Grosvenor LW103 TG – HPI #11 17/08/2020 (PDF, 509.2KB)
- Diagram showing goaf area of LW104 (PDF, 291.7KB)
- Table of LW104 methane exceedances (PDF, 82.0KB)
- Mine Record Entry on 19/03/2020 to conduct an inspection at Grosvenor mine (PDF, 266.9KB)
- Form 5A for Grosvenor LW104 TG – HPI#14 18/03/2020 (PDF, 380.8KB)
- Learning from Incidents Investigation Report for Grosvenor HPIs between 18/03/2020 and 23/03/2020 (PDF, 3.6MB)
- LW104 Goaf Drainage Risk Assessment (PDF, 4.6MB)
- Email from Mining Inspector Stephen Smith to Inspector Peter Newman 09/04/2020 (PDF, 9.8MB)
- Form 1A for Grosvenor LW103 TG – HPI #8 23/07/2019 (PDF, 563.6KB)
- Grosvenor Incident Notification 23/07/2019 (PDF, 55.1KB)
Last updated: 30 Jun 2022